octoplant: AMDT's Platform for Automation Backup, Version Control and Recovery
octoplant Pricing: Editions, Licensing and How to Budget Without a Price List
octoplant pricing explained: Core, Plus and Premium editions, per-campus device licensing, what AMDT does not publish, and the cost drivers to model.
octoplant pricing is not published. As of October 2026, AMDT’s pricing page describes three editions, Core, Plus and Premium, and how the licence is counted, but gives no figures. That is normal for industrial software sold through partners, and it means a buyer has to build the budget from the cost drivers rather than from a list price. This page sets out what is public, what is not, and how to model the rest.
For what the platform does, see the parent page on octoplant; for the company behind it, the AMDT hub.
The three octoplant editions
| Edition | AMDT’s description | Included devices | Likely fit |
|---|---|---|---|
| Core | “Ideal for single sites or early-stage implementations” | Up to 50 | A single plant, or a pilot on one area |
| Plus | “Designed for growing environments, with more devices included (100+) and enhanced features” | 100+ | A full plant with mixed vendors |
| Premium | “The all-inclusive package for medium and large or highly regulated environments” | 250+ | Large sites, regulated industries, or a standard rolled out across a group |
Source: octoplant.com/pricing, as of October 2026. The “likely fit” column is our reading, not AMDT’s.
What the tiers tell you, and what they do not. The tiers step by included device count. AMDT says that within a tier you “can always scale” by adding devices, and that once the count grows “it becomes more cost-effective to upgrade to the next tier rather than adding individual devices” (pricing). Core is offered “without optional add-ons,” Plus has “enhanced features” and Premium “the full suite of advanced capabilities,” so some capability is held back from the lower tiers. Which capability is not published. Ask for the split in writing, in particular for approval workflows, audit trail features used for regulated work, and integrations such as the export APIs.
How octoplant licensing is counted
Three rules are public:
- Per campus. “Each license covers one campus, a physical location that may include multiple buildings on a contiguous piece of land” (octoplant.com). A site with a packaging hall across the road is probably still one campus. Two plants in different towns are two licences.
- Per device. The edition is chosen by how many devices you back up and version: PLCs, HMIs, robots, drives, CNC machines, network devices and PCs.
- Unlimited jobs and documents. “All editions include core functionality, unlimited jobs, and secure data storage,” with “virtually unlimited document storage at no additional cost.” Documents do not count as devices.
The unlimited jobs matter more than they look. A job is a scheduled upload and compare. If jobs were metered, plants would run them less often to save money, and the time between a change and its detection would grow. Unlimited jobs remove that trade-off: you can run nightly compares on every device at no extra licence cost.
What octoplant pricing does not publish
| Item | Status as of October 2026 | Why it matters |
|---|---|---|
| Prices for any edition | Not published | The budget has to come from a quote |
| Feature split between tiers | Not published | You may need Plus or Premium for a feature, not for device count |
| Commercial term (subscription or perpetual) | Not stated on the pricing page | Changes the five-year cost and the renewal risk |
| What counts as one device | Not defined publicly in detail | A PLC with a separate HMI and drives may count as several |
| Price of services | Not published | Implementation and validation can rival the licence |
| Migration credit from versiondog or AutoSave | Not published | Existing customers may have a path; ask |
The device-definition question is the one that changes quotes. On a typical packaging line, an illustrative cell might hold one PLC, two HMIs, six drives, one robot and a managed switch. Whether that is one device or eleven decides the edition. Get the counting rule in writing and apply it to your own asset list.
A worked count (illustrative, not a quote). Assume, for the sake of the arithmetic, that every backed-up item counts as one device. AMDT has not published that rule; it is the assumption to test.
| Item on one illustrative packaging line | Quantity | Counted as a device? |
|---|---|---|
| PLC | 1 | Yes |
| HMI panels | 2 | Yes, if their projects are backed up |
| Drives with parameter sets | 6 | Yes, if their parameters are backed up |
| Robot controller | 1 | Yes |
| Managed switch | 1 | Yes, if its configuration is backed up |
| Drawings, manuals, I/O lists | Many | No: documents are not devices |
| Line total | 11 |
Six such lines is 66 devices, before utilities, palletisers and the network core. That is already past Core’s 50 and into the range where AMDT itself says moving up a tier becomes the cheaper path. Under a one-device-per-line rule, the same plant would sit comfortably in Core. The counting rule moves the edition, so settle it before you compare anything else.
The cost drivers behind octoplant pricing
Without a list price, model the total cost from what drives it. The diagram shows how the pieces combine, and which of them you can know before a vendor conversation.
Five things drive the total:
- Device count. Build the list from an actual inventory, not from memory. Plants routinely undercount drives, robots, HMIs and network devices, and those are what push a site from Core into Plus.
- Number of sites. Each campus is a licence. A group standard across six plants is six licences, even if each plant is small.
- Services. AMDT lists Implementation and Commissioning, Update Service, Job Optimization, TIA Portal Integration, Image Service Integration, IQ/OQ Services and Migration and Expansion. In regulated industries, IQ/OQ (installation and operational qualification) is often required, and the validation effort can be a large share of year-one cost. See 21 CFR Part 11.
- Migration. If you run versiondog or AutoSave, moving archives and job definitions is work, even with the Project Integrator Tool added in release 107. See migration to octoplant.
- Internal effort. Someone has to own jobs, alerts and approvals. That time is a real cost, and the one most often left out of the business case.
Infrastructure is a sixth, smaller driver. octoplant runs mainly on-premises, so budget for a server, its operating system, backup of the server itself, and network changes to let it reach devices. See octoplant architecture.
Where it gets hard
Comparing quotes across tools. Competing products are packaged differently. FactoryTalk AssetCentre is an on-premises Rockwell product, Copia Automation offers cloud, data-centre or air-gapped deployment, and Software Defined Automation (SDA) is browser-based. Their licence units will not line up with a per-campus, per-device model. Normalise every quote to the same device list, the same sites, the same services and a five-year term. The alternatives page describes how the models differ.
Buying the tier for the wrong reason. A site with 45 devices may need Premium because it is regulated, not because of size. A site with 120 devices and no regulation may be well served by Plus. Decide the feature need first, then check the device count.
Growth inside the term. Device counts rise with every new line or machine. Ask how a mid-term move from Core to Plus is priced, and whether new devices delivered by OEMs are covered.
Partners quote differently. octoplant is sold through AMDT and a partner network that AMDT puts at more than 100 firms (octoplant.com). Services rates and bundles vary by partner. Two quotes for the same scope are a reasonable request.
Budgeting checklist: questions to ask

- Which edition fits our device count, and what exactly counts as one device?
- Which features are in Core, Plus and Premium? Please list them.
- Is the licence a subscription or perpetual, and what does renewal cover?
- How is our site layout counted in campuses?
- What does a mid-term upgrade between editions cost?
- What services are included, and which are quoted separately (implementation, IQ/OQ, migration, training)?
- If we run versiondog or AutoSave today, is there a migration path or credit?
- What server and network infrastructure must we provide?
- Who supports us locally: AMDT directly or a partner, and at what response time?
An owner-side view helps here. An owner’s engineer can build the device list, normalise competing quotes and hold the vendor to a written scope, without taking a margin on the licence. If you do not yet know your device count, a plant systems assessment produces it.
Next in this section: octoplant architecture and the release history.
Frequently asked questions
How much does octoplant cost?
AMDT does not publish octoplant prices. As of October 2026 its pricing page lists three editions sized by included device count, licensed per campus, with unlimited jobs. A figure needs a quote from AMDT or one of its partners, and the total will depend on device count, the number of sites, implementation and validation services, and any migration from versiondog or AutoSave.
What is the difference between octoplant Core, Plus and Premium?
Core is aimed at single sites or early implementations and includes up to 50 devices. Plus targets growing environments with 100 or more devices and enhanced features. Premium is the all-inclusive package for medium, large or highly regulated environments, with 250 or more devices. AMDT does not publish which features sit in which tier, so ask for the split in writing.
What does one campus mean in octoplant licensing?
AMDT defines a campus as a physical location that may include multiple buildings on a contiguous piece of land. Each licence covers one campus. A plant with several buildings on one site is likely one campus; two plants in different towns are two. Confirm the definition against your own site layout before the quote.
Do documents count as devices in octoplant?
No. AMDT states that documents do not count towards the device total and that all editions include virtually unlimited document storage. Jobs are also unlimited in every edition. The licence count is driven by the automation devices you back up and version, such as PLCs, HMIs, robots and drives.
Is octoplant sold as a subscription or a perpetual licence?
AMDT's public pricing page does not say. It describes editions and per-campus licensing but not the commercial term. Ask AMDT or the partner quoting you whether the licence is a subscription or perpetual with maintenance, what the renewal covers, and how upgrades between editions are priced.
References and further reading
- Pricing · AMDT (octoplant.com)The three editions, the campus definition, unlimited jobs and the rule that documents are not devices.
- Service and Support · AMDTThe services quoted on top of the licence, including IQ/OQ and migration.
- Where to Buy - Global Partner Network · AMDT (octoplant.com)The partners who issue quotes in each country.
- Octoplant spring release (107) · AMDTThe Project Integrator tool that shortens onboarding.
- About Octoplant · AMDT